We are delighted to present a comprehensive overview of our recent customer feedback, highlighting key insights and showcasing the ongoing efforts to enhance our services. In this report, we delve into the complaints and compliments received, share the outcomes of Stage 1 Complaints in November, discuss our learnings from customer feedback, and celebrate positive remarks from our valued residents.
42 complaints where raised in total in Q1.
| Summary of Complaint | Outcome |
| Complaint on the handling of Anti-social behaviour. | Upheld |
| Entrapment to lift unable to get hold of Worthing Homes out of out-of-hours service. | Upheld |
| Unhappy with contractor as did not identify a CO leak when carrying out the gas safety check. | Upheld |
| Unhappy with us wanting access to the property again after already completing the Electrical Safety Inspection. | Withdrawn by the customer |
| Multiple concerns in relation to boiler, windows, fire safety, operative behaviours, leaks and damp and mould. | Upheld |
| Cleaning has not been done in March, but the contractor had signed the paper to say they had. I was unaware that the cleaning company's manager would be attending to look at the cleaning. | Not Upheld |
| Parking lines are being refused, delay in the lines to his parking bay being done. | Withdrawn by customer |
| Worthing Homes is discriminating and not acting on reports of theft/damage to the property. Disagrees with parking arrangements and how the consultation had been handled. Issue with the intercom. | Not Upheld |
| Could not get through on the phone line. The main door to the building is faulty and not working, and we have to use the fire exit doors, which are unlit and have uneven ground. | Upheld |
| Unhappy that WH's workers sit in their vans for 30 minutes at a time and block disabled parking bays | Withdrawn by customer |
| Delay in front door being replaced and ceiling repairs to the living room following a leak. | Upheld |
| The appointment with the Inspector did not go through the system correctly. | Upheld |
| Customer is unhappy that the extractor works had not taken place and has damp and mould in her home | Withdrawn |
| Unhappy with plaster works from P H Beck, damaged the flooring, and the operatives' conduct when present in the home. | Not Upheld |
| Disputing paying for bird netting | Withdrawn |
| Scaffolders leaving scaffold boards behind, breaking lawn mower when attending to the grass | Withdrawn |
| Disputing rent arrears letter received. | Not upheld |
| Damp & Mould and internal doors not closing correctly. Repair to extractor fans. | Not upheld |
| Damp and mould in the cupboard has not been cleaned as expected, no contact with regards to compensation. | Not upheld |
| Ongoing issues with damp and mould, which are still not fully resolved despite works planned. | Upheld |
| Ongoing issues with showee, repeated visits by operatives, but were unable to find the source of the issue, which caused a delay to the resolution. | Upheld |
| Reporting Anti-social behaviour, which was not a complaint and dealt with via our ASB policy. | Withdrawn |
| Handling of Anti social behaviour, issues with electric meter and issues with being able to get through on the phone lines | Not upheld |
| Disputing service charge not being clear and portal not showing correct amount. Clarity around fire regulations in respect of fitting a water meter and the placement of the meter and that Worthing Homes have not given specific details around this. | Not upheld |
| Boiler that was fitted 1 month ago has been condemned. | Upheld |
| Disputing Worthing Homes requests to do works in the property and visit property. | Not upheld |
| Lack of communication and delay to the sale of home. | Withdrawn |
| Poor communication/ delays in kitchen and flooring works / no useable kitchen | Not upheld |
| The garden as feels this is not useable for specific needs | Withdrawn |
| Service charge payments taken in error. | Withdrawn |
| Handling of Anti social behaviour. | Not upheld |
| Contractor onstalling the wrong boiler not fit for familys needs | Upheld |
| Contractor installing the wrong boiler. | Upheld |
| Delay and lack of communication around the sale of home | Upheld |
| Worthing Homes have taken no responsability for the defects within the property although this is way past the defect period with Persimmons they also have taken no responsability of the issues. | Not upheld |
| Pest issue within the home. | Not Upheld |
| Disputing that the property was advertised with 2 parking spaces when only 1 allocated | Withdrawn by customer |
| Roof leak not repaired reported in Nov 24 has damaged alot of items in her bedroom hasnt been able to sleep in this room. | Upheld |
| Delay from contractor in repairing boiler leak causing a fall. | Upheld |
| 3 x complaints from customers regarding a water outage at the block leaving the customers feeling abandoned and that the situation could have been handled better by Worthing Homes. | All Upheld |
Investigate the reasons for 1, stage 1 complaints, their outcomes, and any compensation provided.
Reason for complaint | Resolution | Outcome |
Conduct of the Housing Officer during the visit and outstanding repairs | Explained changes to the Housing Officer | Not Upheld |
Unfair treatment from the Housing Officer regarding the request for a fence. | Explanation provided | Not Upheld |
Letter received regarding overdue gas safety check, customer felt she had been discriminated against | n/a | Customer Withdrew Complaint |
The introduction letter for the new gas contractor was sent with the incorrect name. This had happened before and had been advised it was resolved | Apology | Upheld |
Previous visits from D&M surveyor however no actions, Issues with roof. | Apology | Upheld |
A leak from the roof came down the bedroom walls. Roof works had not been arranged | Apology | Upheld |
BSW attended the property 1 month ago and did not return, the boiler has now been shut down by Smith & Byford as unsafe | Apology | Upheld |
The taller sink was not installed as recommended by OT, the door hits the bath and the tiling is not complete. | Investigation ongoing | |
Gutter repair was reported on Oct 23 however not complete, quotes for replacement soffits were received in March but no action was taken | Apology | Upheld |
Windows painted shut during communal redecoration and conduct of operative when approached | Apology | Upheld |
Unhappy with the increase in service charge based on services received | Investigation ongoing | |
Requested twice for partner to be added to household however has not received a response | Apology | Upheld |
Time taken for window to be installed (12 months after stage 2) & no H&H for 3 weeks | Apology | Upheld |
Damp & Mould in cupboards were reported on January 24, Concerned for children's health as also mice infestation | Investigation Ongoing | |
DD has not increased for new rent, the letter states this is due to HB error customer does not feel we should recover money | Investigation ongoing | |
The customer & Daughter are stuck in the lift and the lift breaks down regularly | Apology | Upheld |
DD does not increase in April, received no contact regarding this and the account is now in arrears | Investigation ongoing | |
Appealing decision for refused pet request | Confirmed refusal | Not Upheld |
State of the rubbish situation since communal bins were removed | Reminder to all residents on where rubbish should be placed | Upheld |
Bathroom works still have outstanding issues with leaks for the past 2 years | Investigation ongoing | |
Discovered damp and mould in walk-in wardrobe which has damaged clothing | Investigation ongoing | |
Unhappy with nomination refusal | Investigation ongoing | |
Information about HB stopping for sheltered residents | n/a | Customer Withdrew complaint |
Unhappy with service charge for window and communal cleaning compared to service received. | Investigation ongoing | |
Length of time to resolve mould issues reported on Oct 24 | Investigation Ongoing | |
Rent refund not given, communication with a resident regarding issues, multiple repair issues since moving in and information supplied at letting | Investigation ongoing | |
Water coming down the lounge wall, and extensive repairs to the balcony have not resolved the issue that have been ongoing since 2017 | Investigation ongoing | |
Severe damp & mould in bedrooms, the roof was looked at from outside no attempt to go into the loft | Investigation ongoing | |
Dispute service charge amounts | Investigation ongoing |
Learning from Complaints
The Quarterly learning from complaints meeting was held in April, where the following improvements were identified:
Issue Identified | Suggested Improvement |
Flux dripped on gas meter pipework during a boiler installation resulting in a gas leak | Remind Smith & Byford to ensure that the pipework is covered during a boiler install |
Flux dripped on gas meter pipework during a boiler installation resulting in a gas leak | Check with GCS that they are checking the pipework to the meter as part of their audits |
The customer was not clear who was handling his complaint between our contractor and WH | The policy is now clear contractor will handle stage 1 and WH stage 2 |
DO not use warning notice placed on boiler but not explained to the resident | Smith & Byford to ensure they are using the correct procedure when placing danger do not use on boiler. Shawn to check they next 10 notices |
Quality of communications sent by gas contractor | Letters to be reviewed with the Residents Voice |
Data used for new contractor was out of date | Standard mobilisation plan has been created |
Complaint not logged when originally emailed | Training provided to Customer Experience Team |
Consideration needs to be given to who is attending joint visits in sensitive situation | To be discussed with the Neighbourhood teams |
Managing expectations when we are not responsible for repairs during defect period | To be reviewed as part of the Dev handover |
Developer did not receive job tickets | Testing of job tickets to take place before handover to ensure these are working |
Timescales for defects being rectified by the Developer have taken a long time | Review contracts to see if it is possible to build in contractual timescales moving forward |
Investigate the reasons for 9 stage 1 complaints, their outcomes, and any compensation provided.
Reason for complaint | Resolution | Outcome |
Customer has changed their kitchen cabinet and noticed a hole in the wall, installed the cabinet and has reported the hole to be fixed. Resident has been told to remove the cabinet and we will fill the hole customer has found this to be unreasonable | Offered to remove the cabinet as a goodwill gesture | Not Upheld |
Ongoing issues with damp and mould in the property | Remedial repairs ordered | Upheld |
Ongoing issues with a leak from the roof over the last 2 years, repairs have only been done to half the roof and concerns for childs health | Apology | Upheld |
CO2 leak in the property following boiler installation | Investigation ongoing | |
Unhappy with the handling of ASB reports | Investigation ongoing | |
Inspection of the property was completed in February due to damp and mould however no further action since then. | Arrange for Mould treatments and a damp inspection to be completed | Upheld |
Customer felt that the Rent Booklet was misleading and feels the service charge was disproportionate to the service received. | Explanation provided regarding service charge | Not Upheld |
Poor communication from WH & Gas Contractor, customer was not notified of works needed to the boiler and asked to sign for all information included on the gas safety check | n/a | Complaint was withdrawn by the customer |
Customer tap disconnected in their hand, out of hours would not send plumber and therefore water was turned off | Apology | Upheld |
Investigate the reasons for 15 stage 1 complaints, their outcomes, and any compensation provided.
Reason for complaint | Outcome | Resolution |
Damp and mould issues ongoing since 2014, lack of communication from Worthing Homes. | Upheld |
|
Ongoing issues with a leak and damp since August. Source of the leak not identified and works not completed to resolve this. | Upheld |
|
Delays with repairs being completed that have been reported within defect period and lack of communication from WH and Bellway regarding this. | Investigation ongoing | TBC |
EICR completed and item not replaced in cupboard after resulting in trip. | Not upheld | Apology |
No heating and hot water, concerns with window cleaning schedule and time taken to resolve repair issues. | Investigation ongoing | TBC |
Unhappy with the standard of communal cleaning. | Upheld | Apology |
Garden not been cleaned of paint marks following communal redecoration. Garden items removed by contractor. | Upheld |
|
Tree owned and maintained by WH caused damaged to shed. | Upheld |
|
Leak in kitchen 15 months ago however remedial work not completed and poor communication from Worthing Homes. | Investigation Ongoing | TBC |
Delays with replacement windows, increased energy costs and can not afford to have heating. | Upheld |
|
Waste water leak back in Sep 22. The time taken to resolve this is an issue as it has had an impact on mental and physical health. Now experiencing damp and mould again. | Investigation ongoing | TBC |
Damp and mould ongoing since 2019, concerned for children's health. | Upheld |
|
Intermittent leak for past 2-3 years. Damaged ceiling and duvets. Concerned for health of her and child. | Upheld | Surveyor visit arranged to source leak |
Unannounced visit from Housing Officer and Neighbourhood Manager. | Investigation Ongoing | TBC |
Windows causing extreme condensation resulting in mould, windows also very drafty. | Not Upheld | Required works arranged |
Learning from Complaints
Issue Identified | Suggested Improvement |
Housing Officer was on annual leave followed by sickness resulting in cases not being reviewed in a timely manner. | We will review our out of office procedure to ensure that review of cases happens in staff absence and the correct out of office messages are placed on emails. |
Customer raised concerns about ASB Policy and timescales for which we respond. | We will be reviewing the ASB Policy and publish on our website. |
Customer raised concerns that contact information was removed from the website for the Housing Officer. | We will review our customer service offer and ensure that we are clear about the way’s in which we can be contacted. |
We were unable to locate a document from 2015 during a complaint investigation. | We will ensure all staff are trained on using our EDRM document storage solution |
Information not always clear when new builds are handed over from development/defect periods. This has resulted in lack of contractor availability for some repairs and miscommunication to residents. | We will review the handover process from Developer to Worthing Homes, to ensure contractors are invited to attend to view components that have been installed. We will also look to incorporate a detailed handover for key areas of the business. |
Some components in new build properties have different contractors to our standard contractor, however Customer Experience are not always clear on who to use. | We will review this process to ensure the Customer Experience Team receive the correct information at least one month prior to us becoming responsible for repairs. |
CX does not list the individual components for new build properties. | We will review this and are looking at implementing a desk top stock condition survey at the point of hand over which will be input into CX. |
Customers have experienced delays with work being completed by Developers during the defect period. | We will review this process to ensure we are reviewing outstanding works orders, we will also consider options should the works not be completed by the developer. |
During a period of no heating and hot water a Bayside one of the residents was decanted, other residents who were not do not feel this was fair. | We will be reviewing our Decant Policy. |
During periods of no heating and hot water at Bayside, some residents were compensated and not others. | We will be reviewing our compensation policy and the procedure that should be followed where an issue effect multiple households. |
During periods of no heating and hot water at Bayside communication with the residents has been poor leading to frustrations with resident. | Communication moving forward to be done via CX feedback which can be delivered by SMS and Email, this allows us to communicate to allow residents at the same time. Surveys to be issued when we receive an initial report of no heating and hot water. |
Updates for the residents at Bayside has not always been sent in a timely manner causing frustration and resulting in the residents chasing for this. | Communications will now be owned by Ian Reed and his team and will be sent around the 16th of each month. |
Positive Feedback from our residents
“Can you thank the gardens for the wonderful job they are doing in our garden it looks amazing and so beautiful they have worked so hard and me and my husband are so thankful to them”
“Good Morning Emily,
Thank you for your email and attached letter.
May I take a minute to appreciate the response. You haven't left a door unturned and I am grateful for the time you have given up responding to this complaint in the correct manner and timeframe.
I am happy to accept the final response, on the basis (as you say) you will keep in touch to ensure the work is completed on the 1st of March.”
“I have been a resident of worthing borough council and worthing homes for 45 years. Thank you worthing homes. Apart from my kitchen i have a beautiful home. I am so lucky i have had a few hiccups with them over the years but i think thats normal. but Thank you”
Investigate the reasons for 10 stage 1 complaints, their outcomes, and any compensation provided.
| Reason for complaint | Outcome | Resolution |
| Lift broken down and time taken to resolve this | Upheld |
|
| Eviction from property and length of notice given | Not Upheld | Timeline provided |
| Repairs outstanding, multiple communications however work not completed, items damaged. | Investigation ongoing | TBC |
| Lack of action regarding ASB | Not Upheld |
|
| Delays with work being completed by BSW following a new boiler installation | Upheld |
|
| Delays with Section 20 for a replacement door | Upheld |
|
| Delay with heating repairs | Upheld |
|
| Delay with heating repairs | Upheld |
|
| Damp & Mould in property and delay with repairs being completed | Upheld |
|
| Gas leak in property following boiler installation | Investigation ongoing |
Positive Feedback from our residents
“Wanted to Thank Zoe and grounds team for all their hard work”
“Thanks to the ladies on the phones who do a great job”
Investigate the reasons for 6 stage 1 complaints, their outcomes, and any compensation provided.
| Reason for complaint | Outcome | Resolution |
| Allegation that the Housing Officer gained access to the property when the resident was not there. | Not Upheld | Letter was sent confirming we do not have keys to the property |
| Concrete fence support erected by non-resident which sits on Worthing Homes land | Not Upheld | Permission retrospectively granted and letter sent to non-resident stating they must seek permission in future and confirming there is no change in the boundary |
| Lack of response from Worthing Homes regarding concerns for safety in property due to not knowing contractors are due to visit | Upheld | Communal door locks changed, all existing key safes removed and alert placed on file to notify resident when visitors to the building are due |
| Communal cleaning not being completed and damaged caused to residents hoover when cleaning themselves | Upheld |
|
| ‘Do not Use’ notice placed on boiler, Poor communications from Worthing Homes and BSW | Upheld |
|
| Items damaged by damp and mould, standard of works completed by PH Beck and the Housing Manager did not test walls with a damp meter before stating these were dry | Upheld |
|
Positive Feedback from our residents
“Yes so am I they came out very quickly and done a. Great job So thank you for all your help”
Investigate the reasons for 5 stage 1 complaints, their outcomes, and any compensation provided.
| Reason for complaint | Outcome | Resolution |
| Delays with repointing works being completed | Upheld |
|
| Fly tipping | Upheld |
|
| Handling of ASB reports | Partially Upheld |
|
| Damp & Mould and lack of communication/action | Investigation ongoing | |
| Delays with section 20 works being completed | Investigation ongoing |
Learning from complaints:
Communication to customers regarding planned works
Whilst we do communicate with residents regarding upcoming works, we have found that we have not communicated to residents when works are delayed. Communications moving forward to include a single point of contact for the works and the Asset Manager will be reviewing our Housing Management System (CX) processes to ensure regular communications are issued.
Repairs not thoroughly investigated or followed up.
It has been identified that our Surveyors need some further training in correctly diagnosing the root cause of recurring repair issues. We are currently in the process of adding additional resources to our Neighbourhoods teams and it will be an objective for the new Reactive Repairs Manager once in post to look at the training needs of our Surveyors.
Resident Consultation was not held when the fire doors were installed at one of our sheltered schemes.
We recently installed fire doors at one of our sheltered schemes and we did not complete a resident consultation ahead of the doors being fitted. This resulted in a door being fitted to a resident’s property that they have experienced difficulties using. Moving forward we will be holding resident consultations at our sheltered schemes for any fire door replacements before the works go ahead, this will give residents the opportunity to ask any questions and view the type of doors that will be installed.
Positive Feedback from our residents
“Lorna got involved and through “Her tenacity and persistence she managed to get my bill drastically reduced and sort out EDF in the process. She was so helpful, and it was a relief to know that the bill they sent me was not realistic or correct” “Lorna went above and beyond to help me, and I really appreciate it”
“Joanne called to report that the new cleaners are great. She said 2 males attended today and cleaned everywhere. Hoovered, got the high cobwebs and did an impressive job. Much better than the last contractors and asked to keep them!”
“Oh my goodness i’ve just opened the envelope on the way home and I stopped speechless of my goodness!!!! I can’t even explain how stunned and amazed I was! i’m utterly speechless! I’ve always wanted to take my kids to a pantomime!! you have honestly made something I never thought imaginable happen for me and my kids wow i’m literally crying in public”
We believe this information serves as a vital tool in our ongoing commitment to providing exceptional service to our residents. We will use these insights to strengthen our processes and ensure that Worthing Homes remains a place our residents are proud to call home.